A bridge on Berbera highway destroyed by heavy rains.
View attachment 261397
View attachment 261398
View attachment 261399
Construction are build according to standards, is the contractor used sub standard or build it to an extend that even the rain could demolish it, then that my friend is called corruption.nothing todo with corruption it's either:
1. Contractor used sub standard materials
2. the strength of the water was not considered
Construction are build according to standards, is the contractor used sub standard or build it to an extend that even the rain could demolish it, then that my friend is called corruption.
Beside that, the Bridge looks unsafe and unusable
God damn that bridge collapsed faster than SLs bid for ictiraaf.A bridge on Berbera highway destroyed by heavy rains.
View attachment 261397
View attachment 261398
View attachment 261399