Port of Tadjourah under construction in Djibouti

Status
Not open for further replies.

repo

Bantu Liberation Movement
VIP
East-sideview-900x675.jpg


78 million invested project
  • Dedicated to exportation of potash
  • 2 linear quays of about 435 m length and with 12 to 15 m draft
  • Accommodating for 20,000 DWT General Cargo Vessels
  • A RoRo terminal with 190 m length quay and 12 m draft
  • A 30 hectare surface equipped with all port infrastructures
Traffic of 4 million Tons per year
 

repo

Bantu Liberation Movement
VIP
NEW PORT OF TADJOURA
  • Project: Engineering services for the economic and financial study, preliminary and final design, and preparation of the tender dossier for the Port of Tadjoura
  • Place: Tadjoura, Djibouti
  • Client: Ministère de l'Equipement et des Transports of the Republic of Djibouti
  • Total cost: € 126,149,500 of which approximately € 46,513,200 for Phase 1



 

repo

Bantu Liberation Movement
VIP
Construction of 2.7-billion-birr Road Connecting Tadjoura Port Begins

The construction of Dichoto-Galafi-Elidar-Bolho road, which will consume 2.7 billion birr, has commenced.

The road is 81 kilometers long and 15 to 21 meters wide, according to Ethiopian Roads Authority.

The cost of the road will be fully covered by the Ethiopian government.

The surrounding communities will benefit from the road project that is expected to be finalized within three years, it was indicated.

The road being built by the Defense Construction Enterprise will also enable the country to use the new Tadjoura Port.

Potash companies will particularly be relieved of the huge burden to transport their products, the authority said.
 
Status
Not open for further replies.
Top