Work was stalled for 4 months in the summer due to the monsoon season.
Divers will arrive in a few days to guide the antifer placements.
Work on the small 100 meter berth has begun. The 2x200m berths will be done once the breakwater is done. There will be a 100 meter extension after that.
What difference between three type?The antifers will be lined up like this so the berth can be constructed on the other side.
![]()
Great work, mashalla.Pouring the precast berth block. These will be presumably stacked to create a wall.
They will be stacked like this. Someone should make a compilation of this project from start to finish from all the footage there is.Pouring the precast berth block. These will be presumably stacked to create a wall.